Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
According to the following procedure:
(1) Remove the top handrails and railings from the cross, then remove the scaffolding (or horizontal frame) and the escalator, and then remove the horizontal bar reinforcement bar and scissors.
(2) from the top of the cross-side began to disassemble the cross-support, simultaneously remove the top support wall and the top mast.
(3) continue to phase down the next step to remove the second step mast and accessories. Scaffolding free cantilever height shall not exceed three steps, or should be added temporary pull knot.
(4) continuous dismantling down. For even the wall pole, long horizontal bar, scissors support, must be dismantled in the scaffolding to the relevant gantry before being removed.
(5) Remove the sweeping pole, the bottom mast and the sealing rod.
(6) Remove the base, remove the pad and pad.
Sales office:Industrial zone of Botou, Cangzhou City,Hebei Province,China. | |
+86-317-5660798 | |
admin@wstscaffolding.com | |